Map Studies
WASTE DAM DESIGNS AND CALCULATIONS
The most suitable areas for the waste dam are determined on the land and design works are carried out in such a way that excavation-filling and cost ratios are minimal in these areas.
DIVERSION AND BELTING CHANNEL DESIGNS
Projects that remain within the project areas are designed to protect the region from the amount of rain or change the direction of the water.
PROTECTED AREA MAPS
National parks, nature parks, natural monuments, natural reserve areas, wildlife development areas, protection forests, gene protection areas, natural protected areas, wetlands, special environmental protection areas, etc. maps showing areas with protected status.
GEOLOGICAL MAPPING
These are maps where the details found on earth are shown with certain symbologies, where equal height curves are used, and where corner coordinate values for project areas are given.
MINING METHOD DETERMINATION BY 3D (DIMENSIONAL) MODELING
The form of mineralization specific to each mineral deposit may vary. Accordingly, the ore levels determined in the light of the data obtained within the scope of the exploration studies are made 3-dimensional with various programs and made ready for production planning.
OPENCAST DESIGNS AND CALCULATIONS
Safe and physical opencast designs are made by taking into account geotechnical calculations suitable for ore model, geology, and topography.
UNDERGROUND DESIGNS AND CALCULATIONS
The underground mining method most suitable for the ore model is determined and underground design work is carried out following the equipment to be used.